Well control · field units

Kill sheet calculations, step by step

A kill sheet turns four shut-in readings into a pump schedule. From the shut-in drill pipe pressure (SIDPP), true vertical depth (TVD), original mud weight and the slow circulating rate pressure, you calculate kill mud weight, initial circulating pressure (ICP), final circulating pressure (FCP) and the drill pipe pressure step-down while kill mud travels to the bit. This page sets out each formula in oilfield units (psi, ppg, ft, bbl) with one worked example, and explains how the Driller's method and the Wait & Weight method use the same numbers differently.

Reference material only. Well-control operations must follow your company's approved procedures, the rig's own kill sheet, and the training standards of IADC WellSharp or IWCF. DrillX calculators are advisory.

1. The readings you start with

2. The core formulas

Hydrostatic pressure

HP (psi) = 0.052 × MW (ppg) × TVD (ft)

Formation pressure

FP (psi) = SIDPP + 0.052 × OMW × TVD

Kill mud weight

KMW (ppg) = OMW + SIDPP ÷ (0.052 × TVD)

Initial circulating pressure

ICP (psi) = SCR pressure + SIDPP

Final circulating pressure

FCP (psi) = SCR pressure × KMW ÷ OMW

Strokes surface to bit

Strokes = drill string volume (bbl) ÷ pump output (bbl/stroke)

Pressure step-down

psi per 100 strokes = (ICP − FCP) ÷ (strokes to bit ÷ 100)

MAASP

MAASP (psi) = (LOT EMW − MW in hole) × 0.052 × shoe TVD

The constant 0.052 converts pounds per gallon to a pressure gradient in psi per foot. Kill mud weight is usually rounded up to the next 0.1 ppg; some operators add a trip or safety margin on top, which is a company-policy decision and is not part of the basic formula.

3. Worked example

Assume a vertical well shut in after a kick, with these readings:

InputValue
Bit TVD10,000 ft
Original mud weight (OMW)10.0 ppg
SIDPP520 psi
SCR pressure at 30 spm600 psi
Drill string volume140 bbl
Pump output0.100 bbl/stroke
Leak-off test EMW at shoe14.0 ppg
Casing shoe TVD5,000 ft
ResultWorkingAnswer
Formation pressure520 + 0.052 × 10.0 × 10,0005,720 psi
Kill mud weight10.0 + 520 ÷ (0.052 × 10,000)11.0 ppg
Check: KMW hydrostatic0.052 × 11.0 × 10,0005,720 psi (balances FP)
ICP600 + 5201,120 psi
FCP600 × 11.0 ÷ 10.0660 psi
Strokes to bit140 ÷ 0.1001,400 strokes
Step-down(1,120 − 660) ÷ 14≈ 33 psi per 100 strokes
MAASP, original mud(14.0 − 10.0) × 0.052 × 5,0001,040 psi
MAASP, kill mud(14.0 − 11.0) × 0.052 × 5,000780 psi

Notice that MAASP falls once heavier mud fills the annulus above the shoe. A kill sheet should show both values so the crew knows the casing pressure limit at each stage.

4. Driller's method vs Wait & Weight

Both are constant bottom-hole pressure methods: the aim is to hold bottom-hole pressure slightly above formation pressure while the influx is circulated out. They use the same ICP, FCP and KMW; the difference is when kill mud goes in.

Driller's method (two circulations)

First circulation: pump the influx out with the original mud, holding drill pipe pressure at ICP at the kill rate. Second circulation: pump kill mud. While it travels from surface to bit, hold casing pressure constant; once kill mud reaches the bit, hold drill pipe pressure at FCP until kill mud returns to surface.

Wait & Weight (one circulation)

Weight up the pits to KMW first, then circulate once. Drill pipe pressure is stepped down from ICP to FCP on the schedule while kill mud travels to the bit (about 33 psi per 100 strokes in the example), then held at FCP until kill mud returns.

The Driller's method can start circulating immediately and needs simpler arithmetic. Wait & Weight takes one circulation instead of two and generally produces lower casing-shoe pressure when the influx reaches the shoe, at the cost of waiting while mud is weighted up. Which method is used is set by the operator's well-control policy, not by the calculator.

5. Mistakes that kill sheets catch

How DrillX helps

DrillX includes a Driller's and Wait & Weight kill sheet alongside hydrostatic pressure, ECD, annular pressure loss, MAASP from leak-off test, triplex pump output, annular capacity and velocity, and buoyancy and string weight calculators. Values update as you type, in field units, and in English or Arabic. For a kill mud weight lookup table, a deviated-well example and how to calculate kick tolerance, see kill mud weight and kick tolerance. DrillX is in final testing; email info@drillx.app for a demo or early access, or see what DrillX does.

Questions

How do you calculate kill mud weight?

Kill mud weight (ppg) equals the original mud weight plus SIDPP divided by 0.052 times the true vertical depth. For example, with 10.0 ppg mud, 520 psi SIDPP and 10,000 ft TVD, kill mud weight is 10.0 + 520 ÷ 520 = 11.0 ppg.

What is the difference between ICP and FCP?

Initial circulating pressure (ICP) is the slow circulating rate pressure plus SIDPP, and is the drill pipe pressure at the start of the kill. Final circulating pressure (FCP) is the slow circulating rate pressure multiplied by kill mud weight divided by original mud weight, and is held once kill mud reaches the bit.

Why is SICP higher than SIDPP?

Shut-in casing pressure is usually higher than shut-in drill pipe pressure because the annulus contains the influx, which is lighter than drilling mud, so the annulus has less hydrostatic pressure and needs more surface pressure to balance the same formation pressure.

Which is better, the Driller's method or Wait and Weight?

Neither is better in every case. The Driller's method starts circulating immediately and uses two circulations; the Wait and Weight method weights up first and kills the well in one circulation, usually with lower pressure at the casing shoe. The operator's well-control policy decides which is used.

Does MAASP change during a kill?

Yes. MAASP depends on the mud weight above the casing shoe, so it falls when heavier kill mud fills the annulus. In the example, MAASP drops from 1,040 psi with 10.0 ppg mud to 780 psi with 11.0 ppg mud.

Sources and further reading