Ton-mile calculation for drilling line: formulas and slip-and-cut

A ton-mile is the work done by the drilling line in moving one ton (2,000 lb) a distance of one mile (5,280 ft), which is 10,560,000 ft·lb. The round-trip formula in field units is Tr = [D × (Ls + D) × Wm + 4 × D × (M + ½C)] ÷ 10,560,000, where D is depth, Ls is stand length, Wm is buoyed drill pipe weight per foot, M is the weight of the travelling equipment and C is the excess buoyed weight of the BHA. Drilling, coring, short trips and casing runs are all worked out from round-trip values. The running total tells the crew when to slip and cut the drilling line under the rig's cut-off program. This page sets out each formula with a worked example.

Reference material only. Ton-mile limits between slips and cuts, cut length and line replacement must come from the rig's drilling line program, the wire rope manufacturer and your contractor's procedures, normally based on API RP 9B. DrillX calculators are advisory.

1. Why ton-miles matter

The drilling line wears where it bends over the crown and travelling block sheaves and where it wraps on the drawworks drum. Work done by the line, measured in ton-miles, is the accepted way to track that wear. When the running total reaches the figure set in the rig's program, the crew slips new line from the supply reel through the system, moving the worn sections off the critical points, and cuts the used length off the drum. Recording ton-miles for every trip, drilling interval, coring run and casing job is what makes the slip-and-cut schedule work.

2. The formulas

Round trip

Tr = [D × (Ls + D) × Wm + 4 × D × (M + ½C)] ÷ 10,560,000

Same formula, split

Tr = D × (Ls + D) × Wm ÷ 10,560,000 + D × (M + ½C) ÷ 2,640,000

Drilling (reamed once per joint)

Td = 3 × (T2 − T1)

Coring

Tc = 2 × (T4 − T3)

Short trip

Ts = T6 − T5

Buoyed pipe weight

Wm = W × (1 − MW ÷ 65.5)

10,560,000 is 2,000 lb per ton × 5,280 ft per mile. The first term covers the drill pipe, which is lifted out a stand at a time. The second covers the travelling equipment and the heavy BHA, which travel the full depth both ways.

Drilling multiplier. The factor 3 assumes each joint is drilled down, picked up and reamed once before the connection. Some programs use 2 for drilling without reaming and 4 for reaming twice; use the factor in your own program.

Casing. Casing work is calculated with the round-trip formula using the casing joint length and buoyed casing weight, with C = 0, and taken as one half of that result because the casing only goes in the hole. Follow the exact casing formula in your contractor's procedure.

3. Worked example

InputValue
Mud weight10.0 ppg, so BF = 1 − 10.0 ÷ 65.5 = 0.8473
Drill pipeAdjusted weight 21.9 lb/ft, so Wm = 21.9 × 0.8473 = 18.56 lb/ft
Stand length93 ft
Travelling equipment, M75,000 lb
BHA600 ft of collars at 147 lb/ft in air

Excess BHA weight: C = 600 × (147 − 21.9) × 0.8473 ≈ 63,600 lb.

OperationWorkingTon-miles
Round trip at 10,000 ft[10,000 × 10,093 × 18.56 + 4 × 10,000 × (75,000 + 31,800)] ÷ 10,560,000582
Round trip at 11,000 ftSame inputs, D = 11,000659
Drill 10,000 to 11,000 ft3 × (659.4 − 581.9)233
Core 10,000 to 10,090 ft2 × (588.7 − 581.9)14
Short trip 10,000 to 8,000 ft and back581.9 − 437.4144

Drilling the 1,000 ft interval puts about 233 ton-miles on the line, and the trip out at 11,000 ft adds another 659. The pipe term is the larger share at depth because it grows with D², which is why ton-miles climb quickly in deep wells.

4. Slip and cut

The rig's drilling line program, normally built on API RP 9B, sets the ton-miles allowed between cuts and the length to cut. The length depends on the drum diameter, the number of drum wraps and the derrick height, and is chosen so that worn sections move off the crown sheaves and the drum crossover points rather than simply cycling back onto them. A typical routine is:

Many rigs also slip line between cuts to spread wear, and cut early after a jarring job, heavy fishing work or a hard stop.

5. Mistakes to avoid

How DrillX helps

DrillX is drilling operations software in final testing. Its calculators cover hydrostatic pressure, ECD, annular pressure loss, MAASP from leak-off test, triplex pump output, annular capacity and velocity, buoyancy and string weight and a Driller's and Wait & Weight kill sheet, in English or Arabic. Email info@drillx.app for a demo or early access, or see what DrillX does.

Questions

What is a ton-mile in drilling?

A ton-mile is the work done by the drilling line in moving one ton (2,000 lb) a distance of one mile (5,280 ft), which equals 10,560,000 foot-pounds. Rigs add up ton-miles for every trip, drilling interval, coring run and casing job to decide when to slip and cut the drilling line.

What is the round-trip ton-mile formula?

In field units, Tr = [D × (Ls + D) × Wm + 4 × D × (M + ½C)] ÷ 10,560,000, where D is depth in ft, Ls is stand length in ft, Wm is buoyed drill pipe weight in lb/ft, M is the weight of the travelling block, hook and top drive in lb, and C is the excess buoyed weight of the BHA over the same length of drill pipe in lb.

How do you calculate ton-miles while drilling?

Drilling ton-miles are Td = 3 × (T2 − T1), where T1 is the round-trip ton-miles at the depth where drilling started and T2 is the round-trip ton-miles at the depth where drilling stopped. The factor 3 assumes each joint is drilled down and reamed once before the connection.

How are coring and short-trip ton-miles calculated?

Coring ton-miles are Tc = 2 × (T4 − T3), using round-trip values at the depths where coring stopped and started. Short-trip ton-miles are Ts = T6 − T5, the round-trip value at the deeper depth minus the round-trip value at the depth the pipe was pulled to.

How many ton-miles before slip and cut?

There is no single number. The ton-miles allowed between cuts and the length to cut are set by the rig's drilling line program, which is normally based on API RP 9B and depends on line size, drum and sheave diameters, derrick height and the design factor in use.

Why do ton-miles increase so fast in deep wells?

The drill pipe term of the round-trip formula grows with the square of depth, because more pipe is lifted over a longer distance on every trip. In the example on this page a round trip at 10,000 ft is about 582 ton-miles and at 11,000 ft about 659.